The Challenge

IKEA Bristol required a complete reconfiguration of their racking layout to improve the efficiency of their in-store fulfilment space. The challenge was to replace the entire racking system within an active retail environment, ensuring that no trading hours were lost and operations could continue as normal throughout the project.

The Solution

Nene Warehouse Solutions developed a phased installation plan that allowed the project to be completed safely and efficiently overnight. Working in close coordination with IKEA, the project team and installation crew operated on night shifts, cordoning off sections of the store to dismantle and rebuild racking. Up to four runs were completed each evening in line with the new layout. Over an eight-week period, the entire system was replaced without any disruption to daily trading. This approach maximised operational continuity and delivered a fully optimised retail storage solution.

The Finished Project

Get the Right Storage Solution for Your Warehouse

Maximise your warehouse efficiency with our tailored storage solutions. Whether you need adjustable racking, cantilever systems, or high-density drive-in racking, Nene Warehouse Solutions has the expertise and options to meet your unique needs.

Other Projects

Pro Tiler Tools/Topps Tiles – Northampton

Case Studies Pro Tiler Tools/Topps Tiles – Northampton The Challenge Pro Tiler Tools/Topps Tiles, operating from a 140,000 sq ft [...]

IKEA – Sheffield

Case Studies IKEA – Sheffield The Challenge Global furniture manufacturer, IKEA, was in need of a new warehouse and retail [...]