The Challenge

Our existing client required an extension of an already existing racking system due to an increase in demand. In addition to this, beam levels and mesh decks were added to the existing racking system based on the client’s requirements. The additional racking was added to the existing system, whilst racking located in another section of the warehouse was removed to free up space.

The Solution

Nene supplied Stow Adjustable Pallet Racking (APR) from its large stock holding based in The Midlands, along with mesh decks, end of rack barriers and rack deflecktors to protect the new racking system.

Testimonial:

The service I have been provided is second to none. Rob has always been there for us, even through testing times of me changing my mind 100 times on the layout and how it was to be specced out.

The communication regarding delivery and dates of install have always been on the ball and the installation guys have always been polite and communicated any issues or updates regarding the install.


Overall I would recommend you guys to anyone.

The Finished Outcome

As promised, Nene delivered the project on time and within budget due to Nene’s huge stock holding, significantly reducing delivery times due to the racking already being available.